The installed electricity generation capacity from bioenergy in gw of Afghanistan is still 0.00GW, with no variation since 2022.
Installed electricity generation capacity from bioenergy in GW in Afghanistan
No matching regions
Source:
Data availability:
Regions:
214
Date range: 2000 to 2024
Points:
5,161
Measure:
Gigawatt
Afghanistan Bioenergy capacity in GW between 2000 and 2023
Period | Value | Change |
---|---|---|
2023 | 0.00GW | 0.00GW |
2022 | 0.00GW | 0.00GW |
2021 | 0.00GW | 0.00GW |
2020 | 0.00GW | 0.00GW |
2019 | 0.00GW | 0.00GW |
2018 | 0.00GW | 0.00GW |
2017 | 0.00GW | 0.00GW |
2016 | 0.00GW | 0.00GW |
2015 | 0.00GW | 0.00GW |
2014 | 0.00GW | 0.00GW |
2013 | 0.00GW | 0.00GW |
2012 | 0.00GW | 0.00GW |
2011 | 0.00GW | 0.00GW |
2010 | 0.00GW | 0.00GW |
2009 | 0.00GW | 0.00GW |
2008 | 0.00GW | 0.00GW |
2007 | 0.00GW | 0.00GW |
2006 | 0.00GW | 0.00GW |
2005 | 0.00GW | 0.00GW |
2004 | 0.00GW | 0.00GW |
2003 | 0.00GW | 0.00GW |
2002 | 0.00GW | 0.00GW |
2001 | 0.00GW | 0.00GW |
2000 | 0.00GW |