The current installed electricity generation capacity from bioenergy in gw of Barbados is 0.00GW, this remains unchanged from 2021.
Installed electricity generation capacity from bioenergy in GW in Barbados
No matching regions
Data currently not available for this time and region, try a different time period
Source:
Data availability:
Regions:
213
Date range: 2000 to 2023
Points:
4,953
Measure:
Gigawatt
Similar regions to Barbados
Bioenergy capacity in GW
Barbados Bioenergy capacity in GW between 2000 and 2022
Period | Bioenergy capacity in GW | Change |
---|---|---|
2022 | 0.00GW | 0.00GW |
2021 | 0.00GW | 0.00GW |
2020 | 0.00GW | 0.00GW |
2019 | 0.00GW | 0.00GW |
2018 | 0.00GW | 0.00GW |
2017 | 0.00GW | 0.00GW |
2016 | 0.00GW | 0.00GW |
2015 | 0.00GW | 0.00GW |
2014 | 0.00GW | 0.00GW |
2013 | 0.00GW | 0.00GW |
2012 | 0.00GW | 0.00GW |
2011 | 0.00GW | 0.00GW |
2010 | 0.00GW | 0.00GW |
2009 | 0.00GW | 0.00GW |
2008 | 0.00GW | 0.00GW |
2007 | 0.00GW | 0.00GW |
2006 | 0.00GW | 0.00GW |
2005 | 0.00GW | 0.00GW |
2004 | 0.00GW | 0.00GW |
2003 | 0.00GW | 0.00GW |
2002 | 0.00GW | 0.00GW |
2001 | 0.00GW | 0.00GW |
2000 | 0.00GW |