In India, the installed electricity generation capacity from hydro in gw currently stands at 47.33GW, reflecting an increase of 0.11GW (0.2%) compared to 2022.
Installed electricity generation capacity from hydro in GW in India
No matching regions
Data currently not available for this time and region, try a different time period
Source:
Data availability:
Regions:
213
Date range: 2000 to 2023
Points:
4,922
Measure:
Gigawatt
Similar regions to India
Hydro capacity in GW
India Hydro capacity in GW between 2000 and 2023
Period | Hydro capacity in GW | Change |
---|---|---|
2023 | 47.33GW | 0.11GW |
2022 | 47.22GW | 0.44GW |
2021 | 46.78GW | 0.80GW |
2020 | 45.98GW | 0.49GW |
2019 | 45.49GW | 0.17GW |
2018 | 45.32GW | 0.58GW |
2017 | 44.74GW | 1.90GW |
2016 | 42.84GW | 0.52GW |
2015 | 42.32GW | 1.70GW |
2014 | 40.62GW | 1.23GW |
2013 | 39.39GW | 1.14GW |
2012 | 38.25GW | 0.62GW |
2011 | 37.63GW | 1.76GW |
2010 | 35.87GW | 1.09GW |
2009 | 34.78GW | 0.09GW |
2008 | 34.69GW | 0.69GW |
2007 | 34.00GW | 0.96GW |
2006 | 33.04GW | 2.08GW |
2005 | 30.96GW | 2.34GW |
2004 | 28.62GW | 1.44GW |
2003 | 27.18GW | 2.45GW |
2002 | 24.73GW | 0.05GW |
2001 | 24.68GW | 0.97GW |
2000 | 23.71GW |