The installed electricity generation capacity from nuclear in gw in Montenegro remains at 0.00GW, with no change since 2023.
Installed electricity generation capacity from nuclear in GW in Montenegro
No matching regions
Source:
Data availability:
Regions:
210
Date range: 2000 to 2024
Points:
4,994
Measure:
Gigawatt
Montenegro Nuclear capacity in GW between 2005 and 2024
Period | Value | Change |
---|---|---|
2024 | 0.00GW | 0.00GW |
2023 | 0.00GW | 0.00GW |
2022 | 0.00GW | 0.00GW |
2021 | 0.00GW | 0.00GW |
2020 | 0.00GW | 0.00GW |
2019 | 0.00GW | 0.00GW |
2018 | 0.00GW | 0.00GW |
2017 | 0.00GW | 0.00GW |
2016 | 0.00GW | 0.00GW |
2015 | 0.00GW | 0.00GW |
2014 | 0.00GW | 0.00GW |
2013 | 0.00GW | 0.00GW |
2012 | 0.00GW | 0.00GW |
2011 | 0.00GW | 0.00GW |
2010 | 0.00GW | 0.00GW |
2009 | 0.00GW | 0.00GW |
2008 | 0.00GW | 0.00GW |
2007 | 0.00GW | 0.00GW |
2006 | 0.00GW | 0.00GW |
2005 | 0.00GW |