The installed electricity generation capacity from bioenergy in gw in Bosnia and Herzegovina remains 0.01GW, unchanged from 2022.
Installed electricity generation capacity from bioenergy in GW in Bosnia and Herzegovina
No matching regions
Data currently not available for this time and region, try a different time period
Source:
Data availability:
Regions:
213
Date range: 2000 to 2023
Points:
4,953
Measure:
Gigawatt
Similar regions to Bosnia and Herzegovina
Bioenergy capacity in GW
Bosnia and Herzegovina Bioenergy capacity in GW between 2000 and 2023
Period | Bioenergy capacity in GW | Change |
---|---|---|
2023 | 0.01GW | 0.00GW |
2022 | 0.01GW | 0.00GW |
2021 | 0.01GW | 0.01GW |
2020 | 0.00GW | 0.00GW |
2019 | 0.00GW | 0.00GW |
2018 | 0.00GW | 0.00GW |
2017 | 0.00GW | 0.00GW |
2016 | 0.00GW | 0.00GW |
2015 | 0.00GW | 0.00GW |
2014 | 0.00GW | 0.00GW |
2013 | 0.00GW | 0.00GW |
2012 | 0.00GW | 0.00GW |
2011 | 0.00GW | 0.00GW |
2010 | 0.00GW | 0.00GW |
2009 | 0.00GW | 0.00GW |
2008 | 0.00GW | 0.00GW |
2007 | 0.00GW | 0.00GW |
2006 | 0.00GW | 0.00GW |
2005 | 0.00GW | 0.00GW |
2004 | 0.00GW | 0.00GW |
2003 | 0.00GW | 0.00GW |
2002 | 0.00GW | 0.00GW |
2001 | 0.00GW | 0.00GW |
2000 | 0.00GW |