The installed electricity generation capacity from other renewables in gw in Saint Pierre and Miquelon remains 0.00GW, unchanged from 2021.
Installed electricity generation capacity from other renewables in GW in Saint Pierre and Miquelon
No matching regions
Data currently not available for this time and region, try a different time period
Source:
Data availability:
Regions:
204
Date range: 2000 to 2023
Points:
4,724
Measure:
Gigawatt
Similar regions to Saint Pierre and Miquelon
Other renewable capacity in GW
Saint Pierre and Miquelon Other renewable capacity in GW between 2000 and 2022
Period | Other renewable capacity in GW | Change |
---|---|---|
2022 | 0.00GW | 0.00GW |
2021 | 0.00GW | 0.00GW |
2020 | 0.00GW | 0.00GW |
2019 | 0.00GW | 0.00GW |
2018 | 0.00GW | 0.00GW |
2017 | 0.00GW | 0.00GW |
2016 | 0.00GW | 0.00GW |
2015 | 0.00GW | 0.00GW |
2014 | 0.00GW | 0.00GW |
2013 | 0.00GW | 0.00GW |
2012 | 0.00GW | 0.00GW |
2011 | 0.00GW | 0.00GW |
2010 | 0.00GW | 0.00GW |
2009 | 0.00GW | 0.00GW |
2008 | 0.00GW | 0.00GW |
2007 | 0.00GW | 0.00GW |
2006 | 0.00GW | 0.00GW |
2005 | 0.00GW | 0.00GW |
2004 | 0.00GW | 0.00GW |
2003 | 0.00GW | 0.00GW |
2002 | 0.00GW | 0.00GW |
2001 | 0.00GW | 0.00GW |
2000 | 0.00GW |