The installed electricity generation capacity from bioenergy in gw in Saint Vincent and the Grenadines remains fixed at 0.00GW, unchanged since 2021.
Installed electricity generation capacity from bioenergy in GW in Saint Vincent and the Grenadines
No matching regions
Data currently not available for this time and region, try a different time period
Source:
Data availability:
Regions:
213
Date range: 2000 to 2023
Points:
4,953
Measure:
Gigawatt
Similar regions to Saint Vincent and the Grenadines
Bioenergy capacity in GW
More indicators for Saint Vincent and the Grenadines
Saint Vincent and the Grenadines Bioenergy capacity in GW between 2000 and 2022
Period | Bioenergy capacity in GW | Change |
---|---|---|
2022 | 0.00GW | 0.00GW |
2021 | 0.00GW | 0.00GW |
2020 | 0.00GW | 0.00GW |
2019 | 0.00GW | 0.00GW |
2018 | 0.00GW | 0.00GW |
2017 | 0.00GW | 0.00GW |
2016 | 0.00GW | 0.00GW |
2015 | 0.00GW | 0.00GW |
2014 | 0.00GW | 0.00GW |
2013 | 0.00GW | 0.00GW |
2012 | 0.00GW | 0.00GW |
2011 | 0.00GW | 0.00GW |
2010 | 0.00GW | 0.00GW |
2009 | 0.00GW | 0.00GW |
2008 | 0.00GW | 0.00GW |
2007 | 0.00GW | 0.00GW |
2006 | 0.00GW | 0.00GW |
2005 | 0.00GW | 0.00GW |
2004 | 0.00GW | 0.00GW |
2003 | 0.00GW | 0.00GW |
2002 | 0.00GW | 0.00GW |
2001 | 0.00GW | 0.00GW |
2000 | 0.00GW |