Saudi Arabia still reports a 0.0TWh in the electricity generation from coal in twh, unchanged since 2021.
Electricity generation from coal in TWh by Saudi Arabia
No matching regions
Data currently not available for this time and region, try a different time period
Source:
Data availability:
Regions:
214
Date range: 2000 to 2023
Points:
4,957
Measure:
Terawatt-hour
Similar regions to Saudi Arabia
Generation from coal in TWh
Saudi Arabia Generation from coal in TWh between 2000 and 2022
Period | Generation from coal in TWh | Change |
---|---|---|
2022 | 0.0TWh | 0.0TWh |
2021 | 0.0TWh | 0.0TWh |
2020 | 0.0TWh | 0.0TWh |
2019 | 0.0TWh | 0.0TWh |
2018 | 0.0TWh | 0.0TWh |
2017 | 0.0TWh | 0.0TWh |
2016 | 0.0TWh | 0.0TWh |
2015 | 0.0TWh | 0.0TWh |
2014 | 0.0TWh | 0.0TWh |
2013 | 0.0TWh | 0.0TWh |
2012 | 0.0TWh | 0.0TWh |
2011 | 0.0TWh | 0.0TWh |
2010 | 0.0TWh | 0.0TWh |
2009 | 0.0TWh | 0.0TWh |
2008 | 0.0TWh | 0.0TWh |
2007 | 0.0TWh | 0.0TWh |
2006 | 0.0TWh | 0.0TWh |
2005 | 0.0TWh | 0.0TWh |
2004 | 0.0TWh | 0.0TWh |
2003 | 0.0TWh | 0.0TWh |
2002 | 0.0TWh | 0.0TWh |
2001 | 0.0TWh | 0.0TWh |
2000 | 0.0TWh |