The installed electricity generation capacity from bioenergy in gw in the United Arab Emirates remains fixed at 0.01GW, unchanged since 2022.
Installed electricity generation capacity from bioenergy in GW in the United Arab Emirates
No matching regions
Source:
Data availability:
Regions:
214
Date range: 2000 to 2024
Points:
5,161
Measure:
Gigawatt
Similar regions to the United Arab Emirates
Bioenergy capacity in GW
United Arab Emirates Bioenergy capacity in GW between 2000 and 2023
Period | Bioenergy capacity in GW | Change |
---|---|---|
2023 | 0.01GW | 0.00GW |
2022 | 0.01GW | +0.01GW |
2021 | 0.00GW | 0.00GW |
2020 | 0.00GW | 0.00GW |
2019 | 0.00GW | 0.00GW |
2018 | 0.00GW | 0.00GW |
2017 | 0.00GW | 0.00GW |
2016 | 0.00GW | 0.00GW |
2015 | 0.00GW | 0.00GW |
2014 | 0.00GW | 0.00GW |
2013 | 0.00GW | 0.00GW |
2012 | 0.00GW | 0.00GW |
2011 | 0.00GW | 0.00GW |
2010 | 0.00GW | 0.00GW |
2009 | 0.00GW | 0.00GW |
2008 | 0.00GW | 0.00GW |
2007 | 0.00GW | 0.00GW |
2006 | 0.00GW | 0.00GW |
2005 | 0.00GW | 0.00GW |
2004 | 0.00GW | 0.00GW |
2003 | 0.00GW | 0.00GW |
2002 | 0.00GW | 0.00GW |
2001 | 0.00GW | 0.00GW |
2000 | 0.00GW |