The installed electricity generation capacity from nuclear in gw in Japan remains constant at 33.08GW, unmoved since 2022.
Installed electricity generation capacity from nuclear in GW in Japan
No matching regions
Data currently not available for this time and region, try a different time period
Source:
Data availability:
Regions:
209
Date range: 2000 to 2023
Points:
4,799
Measure:
Gigawatt
Similar regions to Japan
Nuclear capacity in GW
Japan Nuclear capacity in GW between 2000 and 2023
Period | Nuclear capacity in GW | Change |
---|---|---|
2023 | 33.08GW | 0.00GW |
2022 | 33.08GW | 0.00GW |
2021 | 33.08GW | 0.00GW |
2020 | 33.08GW | 0.00GW |
2019 | 33.08GW | 4.96GW |
2018 | 38.04GW | 1.09GW |
2017 | 39.13GW | 2.35GW |
2016 | 41.48GW | 0.57GW |
2015 | 42.05GW | 2.21GW |
2014 | 44.26GW | 0.00GW |
2013 | 44.26GW | 1.89GW |
2012 | 46.15GW | 2.81GW |
2011 | 48.96GW | 0.00GW |
2010 | 48.96GW | 0.11GW |
2009 | 48.85GW | 0.91GW |
2008 | 47.94GW | 1.53GW |
2007 | 49.47GW | 0.00GW |
2006 | 49.47GW | 0.11GW |
2005 | 49.58GW | 2.46GW |
2004 | 47.12GW | 1.38GW |
2003 | 45.74GW | 0.17GW |
2002 | 45.91GW | 0.00GW |
2001 | 45.91GW | 0.66GW |
2000 | 45.25GW |