The current installed electricity generation capacity from bioenergy in gw of Spain is 1.15GW, this remains static from 2022.
Installed electricity generation capacity from bioenergy in GW in Spain
No matching regions
Data currently not available for this time and region, try a different time period
Source:
Data availability:
Regions:
213
Date range: 2000 to 2023
Points:
4,953
Measure:
Gigawatt
Similar regions to Spain
Bioenergy capacity in GW
Spain Bioenergy capacity in GW between 2000 and 2023
Period | Bioenergy capacity in GW | Change |
---|---|---|
2023 | 1.15GW | 0.00GW |
2022 | 1.15GW | 0.01GW |
2021 | 1.14GW | 0.00GW |
2020 | 1.14GW | 0.15GW |
2019 | 0.99GW | 0.05GW |
2018 | 0.94GW | 0.02GW |
2017 | 0.92GW | 0.00GW |
2016 | 0.92GW | 0.00GW |
2015 | 0.92GW | 0.00GW |
2014 | 0.92GW | 0.02GW |
2013 | 0.90GW | 0.03GW |
2012 | 0.87GW | 0.09GW |
2011 | 0.78GW | 0.04GW |
2010 | 0.74GW | 0.06GW |
2009 | 0.68GW | 0.15GW |
2008 | 0.53GW | 0.02GW |
2007 | 0.55GW | 0.02GW |
2006 | 0.53GW | 0.04GW |
2005 | 0.49GW | 0.03GW |
2004 | 0.46GW | 0.03GW |
2003 | 0.43GW | 0.08GW |
2002 | 0.35GW | 0.15GW |
2001 | 0.20GW | 0.02GW |
2000 | 0.18GW |